Hi all.
I have a contractor willing to level my new install of an Intex 22x52 pool for $250 plus materials.
Yard is 4 inches off I would guess.
He could either dig with a bobcat a thin layer of fresh topsoil and than tamp the whole thing
or
mat with stone bed covered in topsoil and tampered level.
Which is a better base?
Please not I live in a cold environment and do at times get some heave.
Thank you.:nemo: