My timer is wires with 220V and I need to add a 110v circuit. The conduit is 3/4 inch and has 3 12 gauge wires in it now.
There is plenty of room to add the two 14 gauge wires I need, but how do I pull the additional wires? There is no pull cord in the conduit at this time. I could try to run my snake through it, but I"m not sure that will work. Should I just pull out all the wires, then re-pull all 5 at the same time?
Anyone dealt with this before?
thanks,
dave
There is plenty of room to add the two 14 gauge wires I need, but how do I pull the additional wires? There is no pull cord in the conduit at this time. I could try to run my snake through it, but I"m not sure that will work. Should I just pull out all the wires, then re-pull all 5 at the same time?
Anyone dealt with this before?
thanks,
dave