Wanted a pool for my grandsons for the summer(s). Decided against a frame pool and went with a Doughboy manufacturer Hybred knock-off. Boy o Boy did the costs get out of control. But I am trying to do everything correctly. Ground leveled. Electrical ditched. Fencing. Ready to put up the wall as soon as the winds die down and then complete the filling and plumbing and bonding. Been lurking on this forum for weeks now. Now trying to figure out how to establish the pool chemistry and tomorrow will run tests on my water. Wish me luck