We are adding Solar Heating to our ABG Pool this season. In the process of doing this I will be converting all of our plumbing to 1-1/2 inch PVC Schedule 40 at the same time. We have 4 2x20 Sungrabber panels that will be on a garage roof facing south. The roof is adjacent to the pump location. I have started designing the plumbing based on the great advice from other here.
I am including pics of the work so far in case I have missed something or need to make changes before final gluing of the PVC. I used 3" sections of the PVC in several places just to get the idea, the actual pipe lengths are not all correct.
The Goldline GL-235 controller is not shown in the pics as it has neot been installed yet. I also will be adding another Tee in the return line with another 1/4 turn shut off to control feed to a 3/4 inch line for the fountain and/or slide.
Thanks to all.
1. Overview of Plumbing
2. Valve Locations
3. Pool Return Line
4. Skimmer Line
5. Pump Information
6. Filter Information
I am including pics of the work so far in case I have missed something or need to make changes before final gluing of the PVC. I used 3" sections of the PVC in several places just to get the idea, the actual pipe lengths are not all correct.
The Goldline GL-235 controller is not shown in the pics as it has neot been installed yet. I also will be adding another Tee in the return line with another 1/4 turn shut off to control feed to a 3/4 inch line for the fountain and/or slide.
Thanks to all.
1. Overview of Plumbing
2. Valve Locations
3. Pool Return Line
4. Skimmer Line
5. Pump Information
6. Filter Information