I have called my local excavation company he said he would be here next week to level my 50' x 20' area.
Do I and should I than just wait till April to start putting up pool it would let ground settle.
Kinda wanting to wait till April 1st so I can start pumping water in with out temps going to far down, I would run pump if need be.
Do I and should I than just wait till April to start putting up pool it would let ground settle.
Kinda wanting to wait till April 1st so I can start pumping water in with out temps going to far down, I would run pump if need be.