Search results

  1. E

    iaqualink app and web access

    We opened up our pool last weekend and got everything up and running. I was pleasantly surprised to find that I now have the increased functionality others had through the iaqualink phone app and the web interface . Previously, we only had basic features and needed to control advanced settings...
  2. Screenshot_20220409-071108.png

    Screenshot_20220409-071108.png

  3. Screenshot_20220409-071124.png

    Screenshot_20220409-071124.png

  4. E

    Cover anchors

    I tried antisieze and it did not resist water very well. It moved off the anchor threads and on to the concrete. I only tried it on a couple. I now use pool silicone.
  5. E

    Are Hayward Colorlogic lights really this bad?!?

    We have 4 colorlogics. Had to replace the spa led still under warranty. Now a pool one is dead. I hate them. They frequently get out of sync and the mode needs to be reset which is a pain.
  6. E

    Winterization Plugs

    I have the black rubber plug with wingnuts of various sizes. I did have two gizmos for the skimmers, and i couldn't get one to stop leaking last close, so i used the rubber plugs instead for both.
  7. E

    Winterization Plugs

    Do winterization plugs have a prolonged useful life or should they all be automatically replaced after x amount of years? Gearing up for my close, this will be the second year we will close on our own, fourth overall since the pool was opened. So just trying to think ahead. Definitely frozen...
  8. E

    New Pool Completed - Geographically Central NJ

    Thank you Kim! At this point, I'm following the Pool Start up Calendar that i was provided by the service tech who came the day after fill. He checked the equipment, adjusted valves and turned on the main pump. He also showed me a few pointers to hold me over till indoctrination in less than...
  9. E

    New Pool Completed - Geographically Central NJ

    We just finished our year long pool build. We signed a contract last September, broke ground in early October, and then waited and waited and waited for the pool to be finished. Plumbing was cut by electrical contractors in April, three months later they gave us the ok that the plumbing was...
  10. 6.jpg

    6.jpg

  11. 5.jpg

    5.jpg

  12. 4.jpg

    4.jpg

  13. 3.jpg

    3.jpg

  14. 2.jpg

    2.jpg

  15. 1.jpg

    1.jpg