I read similar when researching last year. I put down filter fabric first, then 3” sand bed, ran a string line to maintain 1% slope, installed/glued pipe, covered pipe w/ 3” sand, filter fabric to keep gravel out or sand, 18” of clean crush and run, filter fabric, then top soil.