Recent content by Garttx

  1. G

    Have Contract Just need to Sign - Pool Build - Pearland Texas

    They are a bit pricey and that is why I waited a while to get one. I wanted a fire pit but my wife wanted me to find something unique and it fit perfectly! I bought the smallest and it is 30 inches and the perfect size for us. Sent from my iPhone using Tapatalk
  2. G

    Have Contract Just need to Sign - Pool Build - Pearland Texas

    I had found some pictures of the structure of the wall before gunite. Sent from my iPhone using Tapatalk
  3. G

    Have Contract Just need to Sign - Pool Build - Pearland Texas

    Well just an update. We are very pleased with the pool! Kids have been swimming almost every other day. Some had requested a picture of our rounded wall we put into place it is now completed with the fire pit. We will get the chairs next. My wife finally found the lights she wanted for the posts...
  4. G

    Jandy LED lighting

    Do you know what wattage LED? They have the 9,20 or 30. I paid around 1,100 each for the additional 30 watts. We have total of 5 in pool and 1 20 watt in spa.
  5. G

    Have Contract Just need to Sign - Pool Build - Pearland Texas

    Thank you very much! The pool is at the closest 5 feet. They said that they don't install any closer than 5 feet from a structure. Sent from my iPhone using Tapatalk
  6. G

    Have Contract Just need to Sign - Pool Build - Pearland Texas

    Just wanted to update everyone on our install. We LOVE it!!! The kids have been swimming even when the water is 72-75 degrees. I do heat the spa and they hang out in there but still go down the slide and jump off the rocks. Due to the nice weather the kids were swimming Christmas Day! For New...
  7. G

    Pearland Fall/ Winter Build

    Any updates ? Sent from my iPhone using Tapatalk
  8. G

    Have Contract Just need to Sign - Pool Build - Pearland Texas

    The PB has done a great job taking care of the punch list. The kids have been in the pool almost everyday since they said "GO!". https://vimeo.com/192865086 The slide is wonderful and the kids love it. It is still too cold for me to try at 70 degrees on the pool water!! Sent from my iPhone...
  9. G

    Have Contract Just need to Sign - Pool Build - Pearland Texas

    Okay we just did pool school [emoji3]. I will be ordering my test kit from TFP. I however have a question not regarding chemicals. The Polaris cleaner I turned on to test. The pump makes a weird noise and the Polaris does not move at all. I disconnected the Polaris from the wall and turned on...
  10. G

    Have Contract Just need to Sign - Pool Build - Pearland Texas

    We secured the slide today to the deck. Basically used a marker through the holes to mark 8 drill locations. Moved slide and used a 1/2 inch concrete drill bit with a larger hammer drill. I had tried my hammer drill at first BUT it was under powered. Placed bolts in holes and slide back over the...
  11. G

    Have Contract Just need to Sign - Pool Build - Pearland Texas

    The electrician was supposed to come by yesterday. The variable speed pump for the circulation is tripping the breaker when it is turned on. Also the 2.5 hp motor is in the wrong place. It is attached to the spa and the 2.0 hp motor is attached to the waterfall, bubblers and slide it is supposed...
  12. G

    Have Contract Just need to Sign - Pool Build - Pearland Texas

    Thanks so much we are very pleased. Sent from my iPhone using Tapatalk
  13. G

    Have Contract Just need to Sign - Pool Build - Pearland Texas

    I know y'all are probably getting sick of all the posts but I figured out the lighting and thought some pics were in order. As I have read on TFP the red color is not strong but still cool. My kids love the disco feature! Sent from my iPhone using Tapatalk
  14. G

    Have Contract Just need to Sign - Pool Build - Pearland Texas

    Today the PB crew came out and did the initial chemicals for the startup. They put two circulation pumps.. 1 in the pool, 1 in spa and told me to have them run and they would be back Monday. Then I will start the brushing of the pool and program the aqualink etc. I was able to turn on the LED...
  15. G

    Have Contract Just need to Sign - Pool Build - Pearland Texas

    From what I can tell there are no adhesives. I did have to get the shims ordered no cost from SR Smith. The decking slopes some and I need about 1/4. I am going to use a hammer drill 4" into the slab and put in the anchor bolts. The pool finished filling about 28 hours with 2 hoses. We...