Been a minute since I had a project update...
In the last 3 weeks, we’ve:
Added plumbing and regraded the dirt
Moved the equipment pad location to behind the grotto (not to scale on the drawing, it is pulled aside for plumbing layout)
Poured the grotto roof structure (all of the above just in...