Last year was my first year with an intex AGP. I leveled the ground by digging up a bit, filling with dirt, then putting a layer of sand on top to get it level. Considering how not level my backyard is, I got it pretty level, but I did have two slightly low spots as I could tell by where water would go over the edge when there was a lot of movement. Last year I use a 8ft 2x4 or 2x6 attached to something in the center of my area, then kept pushing that around in circles to get everything as level as i could.
So right now i have my sand layer with the pavers still where the posts were last year. I didn't cover the area up during the winter or anything.
But what would be the proper way to relevel everything, or at least raise those couple slightly low spots?
Do I just need to get more sand and put that down in the lower spots from last year, as well as any spots that seem low now, to get that up a bit, as well as use the wood going in circles? Do i have to redig up the whole thing and redo it all?
So right now i have my sand layer with the pavers still where the posts were last year. I didn't cover the area up during the winter or anything.
But what would be the proper way to relevel everything, or at least raise those couple slightly low spots?
Do I just need to get more sand and put that down in the lower spots from last year, as well as any spots that seem low now, to get that up a bit, as well as use the wood going in circles? Do i have to redig up the whole thing and redo it all?