- May 16, 2011
- 1,180
- Pool Size
- 28000
- Surface
- Plaster
- SWG Type
- Pentair Intellichlor IC-60
I had read on this site the recommendation to have all equipment at the pad hooked up with unions to allow for easy removal if there should ever be a problem. One of the builders we are considering said he doesn't like to use them because they are a place of potential failure, but that he leaves enough pipe between things for future cuts if necessary. What do you think of that? Is having unions something to insist on?