Under Construction in PA

Ran into a snag, when ready for plaster PB found a leak in one of the return lines, under the concrete deck of course! The plumbers were out today to fix it and had to tunnel under the deck but they found the leak and repaired it. I'll post some pictures soon.
 
Here are some pics of the leak, repair and damaged pipe

IMG_2469.JPG


IMG_2476.JPG


IMG_2477.JPG


IMG_2479.JPG
 
They were there about 6 hours, the truck just pulls up in the driveway and they pump the plaster in the pool and trowel it on, the guys were very neat and did not leave any mess, pool is 1/2 full now!
 

Enjoying this content?

Support TFP with a donation.

Give Support
Re: COMPLETE (almost)! - Under Construction in PA

Pool was plastered last week (4/23) and took 2 days to fill, got PB Pool School on 4/27 and I'm off and running, went with modified bicarb startup to minimize plaster dust and get the best possible finish. Everything seems to be working out well.

Here are a few pics, I'll get some better ones later today when the full sun is out.

IMG_2501.JPG


IMG_2505.JPG


Next is Phase 2 - The Pavillion!
 