Looking good. It only takes a few days of solid work to get from where your'e at to having it all backfilled, graded and ready for concrete. We have a similar drainage issue where a hill runs down against the deck. The PB has graded the area around the deck so it should run off naturally in the right direction. However if we have any issues with heavy rains, all I need to do is put in a french drain.