Hey guys, I have decided to do foam wall covering, foam cove and foam flooring instead of sand.
What is the correct layering to do in this case?
These are the options I see:
1) Foam floor first, the cove on top of that and then the foam on the walls.
2) Foam on the walls first, foam floor, the foam cove.
3) Foam on the floor, foam on the walls, foam cove.
I am leaning towards #3 being the most logical (as in there would be the most give and evenness between the mating areas), and if I had a sand floor I can see putting down the foam cove first and then the sand on top of it (since the cove keeps the sand from washing out in that case), but what about an all-foam installation?
What is the correct layering to do in this case?
These are the options I see:
1) Foam floor first, the cove on top of that and then the foam on the walls.
2) Foam on the walls first, foam floor, the foam cove.
3) Foam on the floor, foam on the walls, foam cove.
I am leaning towards #3 being the most logical (as in there would be the most give and evenness between the mating areas), and if I had a sand floor I can see putting down the foam cove first and then the sand on top of it (since the cove keeps the sand from washing out in that case), but what about an all-foam installation?