I have a schedule set in ScreenLogic. It ran fine until 2pm, switching back and forth between spa and pool, but then when it was supposed to switch back to spa from pool, spa never turned on. Wondering why this might have been?
Schedule was: 6a-8a-pool, 8am-10a-spa, 10a-2p-pool, then was supposed to switch back to spa from 2p-4p and never did.