I am starting to backfill my pool walls as directed by my contractor friend who is helping with this diy in ground vinyl (steel) build. I am told to use the dirt from excavation to back fill on top of the concrete that was poured on the base of the steel walls and braces. Then water settle the dirt. I am a little confused because I thought that backfill need to happen as the water was being installed? Am I doing this right?
Thanks
Thanks