I'm getting even more carried away.
I installed a PE653RC (Multiwave controller with remote) and am loving the scheduling abilities and not having to worry about the old manual timers getting out of synch.
In my adventure I'm trying to figure out the wiring / capabilities of the P4243ME and haven't been able to find BOO about it.
Right now I have:
CIR1 & CIR2 for the pump (single speed now - saving 2 for the 2 speed that is getting installed0)
CIR3 for the booster pump
CIR4 Open - Reserved for the P4243ME
CIR5 Heater
I'm wondering how much (if any) smarts there are between the 653 and the 4243 ... any tip on where to find the manual for the 4243? The 653/953 combo manual wasn't exactly helpful.
My dilemma is that I have 5 circuits, want to add the 4243 for the valve actuation when going to spa mode and dont have a circuit to hang the stenner from (I'm thinking I'll use one of the old intermatic 104s) ... is there a better way given the 653 / 4243 combination?
I installed a PE653RC (Multiwave controller with remote) and am loving the scheduling abilities and not having to worry about the old manual timers getting out of synch.
In my adventure I'm trying to figure out the wiring / capabilities of the P4243ME and haven't been able to find BOO about it.
Right now I have:
CIR1 & CIR2 for the pump (single speed now - saving 2 for the 2 speed that is getting installed0)
CIR3 for the booster pump
CIR4 Open - Reserved for the P4243ME
CIR5 Heater
I'm wondering how much (if any) smarts there are between the 653 and the 4243 ... any tip on where to find the manual for the 4243? The 653/953 combo manual wasn't exactly helpful.
My dilemma is that I have 5 circuits, want to add the 4243 for the valve actuation when going to spa mode and dont have a circuit to hang the stenner from (I'm thinking I'll use one of the old intermatic 104s) ... is there a better way given the 653 / 4243 combination?