Ok my liner is getting replaced this weekend yay... Therefore pool will be getting filled with fresh tap water.
What should my plan of attack be with my chemicals
I was going to test once full and right away get my PH correct. Next I was going add enough chlorine to get my pool into range, then I was going to add my stabilizer.
According to the Pool calculator I need to add approx 12 lbs of stabilizer to the pool to get it to 40 CYA. (how should I add 12 lbs of CYA, I have read the sock method but 12 lbs is a lot. Should this all be added at once in multiple socks or over a period of time.) If I am missing anything please let me know as Id like to get my chemicals ready so I am prepared for the weekend.
I am using a Taylor K-2006 Test Kit.
My pool specs are in my signature
What should my plan of attack be with my chemicals
I was going to test once full and right away get my PH correct. Next I was going add enough chlorine to get my pool into range, then I was going to add my stabilizer.
According to the Pool calculator I need to add approx 12 lbs of stabilizer to the pool to get it to 40 CYA. (how should I add 12 lbs of CYA, I have read the sock method but 12 lbs is a lot. Should this all be added at once in multiple socks or over a period of time.) If I am missing anything please let me know as Id like to get my chemicals ready so I am prepared for the weekend.
I am using a Taylor K-2006 Test Kit.
My pool specs are in my signature