Re: Newbie from AZ--9/13 updates
My pool build is WAY behind the schedule because of some glitches here and there. But no complaints for my PB thus far. They're just slow adjusting details rather than masking mistakes that I would never notice. Today is the 3rd day for the coping, decking, and masonry wall for water features. They're breaking down the wall again to back it off a couple of inches away from the pool and waterline tile d/t stability issues. I'm trying very hard to be optimistic. It's a pure fun to watch my pool transforms day by day exactly like I designed.
My pool build is WAY behind the schedule because of some glitches here and there. But no complaints for my PB thus far. They're just slow adjusting details rather than masking mistakes that I would never notice. Today is the 3rd day for the coping, decking, and masonry wall for water features. They're breaking down the wall again to back it off a couple of inches away from the pool and waterline tile d/t stability issues. I'm trying very hard to be optimistic. It's a pure fun to watch my pool transforms day by day exactly like I designed.