You sure make good use of your space. I can't help thinking though that if the pool let go it would be quite the water ride down that hill.
Gustopher said:Wow, that is amazing! Can I ask or have you msg me who you hired to install the pool? I'm very surprised that the pool companies I have called and talked to are so slow to get back to me to get this process going. I am also in MN and have a slope, although not nearly as severe as yours. Did the same contractor do your decking? I'd love to get it installed this fall so that in the spring we can start it right up and enjoy it. Thanks for any info and enjoy the rest of the summer!
Assuming you are digging down to undisturbed ground and not building up like MNhotrod did/had too, then you should be able to get by without.Gustopher said:My slope is really just 1-2 feet of excavating. Would i need an engineer for that?