Hi
I have a new plaster pool. I had fiberglass in the past. Its been installed for about 2 weeks and the pool builder is still handling the chemicals. I noticed it was cloudy today and checked the CYA and chlorine. Both were zero. Is it ok to add stabilizer and bring the chlorine to 5 ppm while the acid wash start up is occurring? I believe that process occurs over the first 30 days but I’m not sure
Thanks in advance
I have a new plaster pool. I had fiberglass in the past. Its been installed for about 2 weeks and the pool builder is still handling the chemicals. I noticed it was cloudy today and checked the CYA and chlorine. Both were zero. Is it ok to add stabilizer and bring the chlorine to 5 ppm while the acid wash start up is occurring? I believe that process occurs over the first 30 days but I’m not sure
Thanks in advance