New Pool Build - Cypress, TX

This is a more detailed response for things to do or watch on:
Day of Plaster
  • Clean up around the pool area the day before - brush any dirt/mud or debris that could be tracked into the pool during or after plaster
  • Verify that the bags of plaster are the proper type and color you selected on morning of plaster.
  • Take a sample of the mixture when they are applying it to the pool by pouring some in a small clear plastic cup (good for reference later)
  • Do they have all the proper return nozzles and drain covers (type and color) to place after plaster installed
  • Have you tested your fill water? Are you filling with softened water or regular tap water or well water?
  • Have your hose ready (and clean) as it will be laying in the pool.
  • Tie a sock or cloth around the nozzle so it does not sit on the plaster.
  • Put the end of the hose at the lowest part of the pool to avoid channeling in the new plaster. Also, consider tying a plastic jug to the nozzle such that it will float up as the water rises.
  • Ensure you take note (or a picture) of your water meter reading before you start to fill
  • Be prepared to take note of your water meter as the pool reaches certain levels, i.e bottom of bottom step, top of bottom step, etc. (it helps in the future to know volume of your pool at certain levels - should you ever have to drain portion of it)
  • Plan to set an alarm every 4 hours (or so) to ensure hose is still in pool, no debris blew into pool, etc.
  • Do NOT stop the flow of water once the pool starts filling as doing so could cause a ring on the new plaster.
  • Take a picture of any chemicals they bring on site that they plan to dump in when they start to add water to pool
  • Continue to fill pool to center of water tile or center of skimmer. Take picture of water meter at end of fill
  • Get clear instructions from PB as what to do the day the pool is full - how often to brush, will the pump be turned on, etc.
  • Define with PB when he will be back out to set up water chemistry.
Thanks for this!
 
The decking was completed a few days ago and today was Pebble Tech day. They'll be back tomorrow to acid wash and start to fill. If all goes well, we will have the equipment up and running on Saturday. We still have a few items left after this, like grass and sprinklers, but we're excited to be near the end of this project.

Finish: Pebble Sheen
Color: Blue Surf with Shimmering Sea
 

Attachments

  • IMG_6005.jpeg
    IMG_6005.jpeg
    457.2 KB · Views: 32
  • IMG_6006.jpeg
    IMG_6006.jpeg
    479.2 KB · Views: 32
  • IMG_6007.jpeg
    IMG_6007.jpeg
    612.3 KB · Views: 31
Pool was filled last week on Saturday. Sprinklers and sod are the final items left. We’re glad to almost be done with this project 😊.
 

Attachments

  • 5000A724-ACC4-4864-93ED-BBAAD14ACF49.jpeg
    5000A724-ACC4-4864-93ED-BBAAD14ACF49.jpeg
    546.9 KB · Views: 28
  • 525E33A2-DA9A-4344-B22A-AB6579417FCA.jpeg
    525E33A2-DA9A-4344-B22A-AB6579417FCA.jpeg
    537 KB · Views: 27
  • Like
Reactions: HermanTX
Pool was filled last week on Saturday. Sprinklers and sod are the final items left. We’re glad to almost be done with this project 😊.
Niiicee! Everything turned out really nice and your build went pretty smoothly and quickly once they started on it! Hope your family enjoys it for many years to come.
 
  • Like
Reactions: /Ejm25
Pool was filled last week on Saturday. Sprinklers and sod are the final items left. We’re glad to almost be done with this project 😊.
Great that things went well.
As a reminder - please fill out your signature with details of the pool and equipment and test kit so it is readily available when future questions are posted. Go to Settings then Signature to update it. Many thanks. Create Your Signature
 
  • Like
Reactions: /Ejm25