Ok, i have finished. It took me two full days due to the fact that my plumbing coming out of the concrete slab was way to close together. As a result i had to use a bunch of 45s to give me a little more room.
I went ahead and left the two pvc to cpvc welds where i used pvc only solvent in place (see couple of posts above). I did get the right glue for the rest of the pvc to cpvc joints though. No issues so far.[attachment=0:3c0qngap]uploadfromtaptalk1367177511903.jpg[/attachment:3c0qngap]
Anyway, attached is my finished product.
Sent from my LG-P769 using Tapatalk 2
I went ahead and left the two pvc to cpvc welds where i used pvc only solvent in place (see couple of posts above). I did get the right glue for the rest of the pvc to cpvc joints though. No issues so far.[attachment=0:3c0qngap]uploadfromtaptalk1367177511903.jpg[/attachment:3c0qngap]
Anyway, attached is my finished product.
Sent from my LG-P769 using Tapatalk 2