Got our pool heater gas hooked up, tried it out yesterday and it takes no time at all to get the Spa toasty.
Cleanup crew hauled off tke last of the construction trash.
Most of the extra dirt was moved behind the waterfall. Some still needs to stay to block our septic sprinkler while we wait for the permit to move it.
Got some more rock work done on waterfall. Balancing out design, sealing the cistern with hydraulic cement and leveling out the cistern overflow onto rocks.
Cap rocks lowered into place, but still loose.
Tried it out today, gets good flow over 4 of the 5 spillways. A little more fine tuning will resolve that.
Unfortunately the cistern still appears to leak out the back of the waterfall. Also the pressure line may have been damaged as there is some water coming out of it too.
Started building raised planter off side of deck. Moved some of the palms into place to work out their final positioning behind waterfall.
Battling the rain as it washed all the soil from around the edges of the deck. Can't get the turf in until all the soil is in place, and that won't happen until septic heads are moved.
Cleanup crew hauled off tke last of the construction trash.
Most of the extra dirt was moved behind the waterfall. Some still needs to stay to block our septic sprinkler while we wait for the permit to move it.
Got some more rock work done on waterfall. Balancing out design, sealing the cistern with hydraulic cement and leveling out the cistern overflow onto rocks.
Cap rocks lowered into place, but still loose.
Tried it out today, gets good flow over 4 of the 5 spillways. A little more fine tuning will resolve that.
Unfortunately the cistern still appears to leak out the back of the waterfall. Also the pressure line may have been damaged as there is some water coming out of it too.
Started building raised planter off side of deck. Moved some of the palms into place to work out their final positioning behind waterfall.
Battling the rain as it washed all the soil from around the edges of the deck. Can't get the turf in until all the soil is in place, and that won't happen until septic heads are moved.