Hi TFP,
We just had our pool dug, dropped in, backfilled, and water filled yesterday. Everything is plumbed (pump, filter, etc). The only things needed now are: electrician to hook everything up on Monday, inspection on Tuesday, startup sometime during the week (which includes charging filter with DE and putting salt in pool) and then deck to be poured around perimeter at a later date (probably within a week).
Questions are:
1. What do I or can I do in the meantime with the water so it doesn't turn on me (algae)?
2. How do I raise the CYA if given water fill has none (what specific products/brands to use)? And yes I have the tf100 kit and will do a whole analysis here shortly and post I promise) lol
Thx in advance!!!
We just had our pool dug, dropped in, backfilled, and water filled yesterday. Everything is plumbed (pump, filter, etc). The only things needed now are: electrician to hook everything up on Monday, inspection on Tuesday, startup sometime during the week (which includes charging filter with DE and putting salt in pool) and then deck to be poured around perimeter at a later date (probably within a week).
Questions are:
1. What do I or can I do in the meantime with the water so it doesn't turn on me (algae)?
2. How do I raise the CYA if given water fill has none (what specific products/brands to use)? And yes I have the tf100 kit and will do a whole analysis here shortly and post I promise) lol
Thx in advance!!!