L-shaped pool build progress

Before it comes up also, I had asked about the return and light on the sun shelf. They told me there isn’t enough space so we put a light near it instead. He said the bubblers act as returns as well. Hopefully that’ll be enough…he said ill have to get my own pour-a-lid from Amazon (he sent a link of the product I’ll need) then give it to them when it’s the appropriate time bec they don’t do that in their contract.
 
Hello! Just a quick status update. Excavation started last Friday. Today, almost a week later, they are starting steel work. Things are moving pretty fast!
 

Attachments

  • IMG_1865.jpeg
    IMG_1865.jpeg
    495.3 KB · Views: 23
  • IMG_1867.jpeg
    IMG_1867.jpeg
    557.6 KB · Views: 23
  • IMG_1878.jpeg
    IMG_1878.jpeg
    769.2 KB · Views: 25
  • IMG_1980.jpeg
    IMG_1980.jpeg
    830.2 KB · Views: 24
  • IMG_1981.jpeg
    IMG_1981.jpeg
    834.9 KB · Views: 24
  • IMG_1987.jpeg
    IMG_1987.jpeg
    538.5 KB · Views: 24
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.