It's been a long month but the pool is up and all the plumbing is complete. Since the plumbing took so long, the walls started to develop a slimy layer!
Since I'm new to this, any advice is greatly appreciated! From what I've read, I should slam the pool after adjusting TA and Ph and scrub the walls and floor down. Check FC at night and recheck first thing in the morning to see if anything is using up the FC. No SWG during the slam and run the pump 24/7.
Do I keep adding liquid chlorine in to bring it to shock levels each morning if it keeps dropping!
once that is done, retest all parameters then add salt to recommended levels, fire up the SWG.
add in borates and Muriatic acid.
if I missed anything let me know.
oh, first sample results are as follows:
3 ppm FC
0.2 ppm CC
7.4 pH
20 ppm TA
20 ppm calcium hardness
0 CYA
40 ppm salt
Since I'm new to this, any advice is greatly appreciated! From what I've read, I should slam the pool after adjusting TA and Ph and scrub the walls and floor down. Check FC at night and recheck first thing in the morning to see if anything is using up the FC. No SWG during the slam and run the pump 24/7.
Do I keep adding liquid chlorine in to bring it to shock levels each morning if it keeps dropping!
once that is done, retest all parameters then add salt to recommended levels, fire up the SWG.
add in borates and Muriatic acid.
if I missed anything let me know.
oh, first sample results are as follows:
3 ppm FC
0.2 ppm CC
7.4 pH
20 ppm TA
20 ppm calcium hardness
0 CYA
40 ppm salt