Filling Pool At End of Season

Coryl397

New member
Apr 23, 2020
2
Voorhees,nj
Hello all. I emptied my unground gunite pool for tile and coping replacement. I am refilling with tap water, with a pH of 7.0. My question is, do I need to add any chemicals besides chlorine prior to closing? I would prefer to winterize the equipment when the pool is empty, fill with water to below the tile line, then cover. Thank you for your thoughts!
 
Welcome to TFP.

What is the CH level of your fill water?

Your plaster needs adequate calcium in the water or it will leach calcium out of the plaster during the winter and weaken it.

 
Last edited:
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.