Converting from Baquacil to bleach.
23,000 gallons, Eastern New Mexico, Taylor k-2006 kit, sand filter.
I started the conversion on Monday, pool water is clear and looks really nice, however still loosing 4ppm overnight, the last 2 nights. I was just wondering if someone can give me a time frame for conversion. I have used around 25-30 bottles of 8.25% bleach(ready for that number to slow down), and my sand needs to be changed desperately.
Just looking for timeline guidance.
Thanks
23,000 gallons, Eastern New Mexico, Taylor k-2006 kit, sand filter.
I started the conversion on Monday, pool water is clear and looks really nice, however still loosing 4ppm overnight, the last 2 nights. I was just wondering if someone can give me a time frame for conversion. I have used around 25-30 bottles of 8.25% bleach(ready for that number to slow down), and my sand needs to be changed desperately.
Just looking for timeline guidance.
Thanks