CAVJOCK22 said:
Looks like a platinum builders quote?
Yes, Bid 3. Just received Bid #4. Will make decision tonight, any thoughts?
RE: Pool & Spa Job #13214
We are pleased to provide labor and materials to complete the following pool project.
POOL
97’ perimeter, 3’-6”- 5’ depths, 1 set of steps, 1 bench. 12” Brick Coping, Standard tile of homeowners choice Hayward Ecostar variable speed pump
Hayward 425 cartridge Filter
Hayward 400,000 BTU gas heater
3 Savi LED lights
2 – Skimmers, 6 returns in pool, 2 main drains
SPA
25’ Perimeter, 1 bench with 1 step
Cascade waterfall or scupper waterfall
8 Jets, 1 Savi LED light, 2 main drains
Brick coping and standard tile of homeowner’s choice
There will also be the removal of 4 scrubs and some trees in the corner of yard.
Start-up Kit to include pole, vacuum head, net, hose and brush.
We will do acid start up on pool and then put first chemicals in and leave you with small bucket of chlorine and 4 gallons of acid.
735sq. ft. concrete decking with spray finish, and includes spray finish on 242 sq. ft. decking. White plaster for pool and spa.
Total Price: $48,400.00 Alternate for 100% Quartz Add: $ 1,190.00