Hey all,
I am new to the forum, but am loving all the advice and help I have found so far. My wife and I have debating about building a pool for quite some time now, and have finally opted to go for it. We have spoke with a few companies and have made our decision on one, I wanted to include our estimate for the pool to get your thoughts on if there is anything I am missing by chance, and if the quote seems decent. Thanks again for all your help, and looking forward to taking you all on this journey. Please see below quote:
Parkwood Pools Advantage Program
Scope of work
27’X15’ Lagoon
STRUCTURAL:
· STEEL REINFORCING THROUGHOUT STRUCTURE TO MEET
· ASTM NO.A615
· GRAVEL ROCKBASE FOUNDATION FOR DEEP END POOL SHELL
· GUNITE CONCRETE SHELL TO MEET OR EXCEED LOCAL BUILDING CODES
· MIMIMUM 8” GUNITE WALLS & FLOORS
· GUNITE STRUCTURAL PERIMETER BOND BEAM CONSTRUCTION
· PRE- BENT STEEL LOOP TIE IN’S 9” ON CENTER FOR BOND BEAM TO WALL STEEL
· GUNITE STEPS IN SHALLOW END OF POOL
· GUNITE EXTENDED BENCH IN DEEP END OF POOL (SWIMOUT)
· LIFE TIME STRUCTURAL WARRANTY
PLUMBING & HYDRAULICS:
· SCHEDULE 40 NON-CORROSIVE PVC PLUMBING
· BACKFILL OF CONCRETE SHELL AND PLUMBING LINES
· ANTI-VORTEX SINGLE CHANNEL DRAIN ( NEW SAFETY DRAINS)
· INDEPENDENT POOL CLEANER LINE WITH SPRING LOADED SAFETY CAP
· AUTOMATIC WIDE MOUTH SKIMMER ENCASED IN GUNITE BEAM
· MINIMUM 3RETURN LINES FOR CIRCULATION, 3 RETURNS IN WAL FOR HEATING AND CHEMICAL CIRCULATION
· HYDROSTATIC UPLIFT VALVE WITH UNDERDRAIN STUB OUT FOR FUTURE DRAINAGE
· HOOK –UP & PRESSURE TEST PLUMBING LINES FROM FILTER TO POOL 50’ PIPE RUN
· OVERFLOW LINE FOR CONVENIENT AUTO DRAIN
· SMALL MACHINE ACCESS CUSTOMER TO SUPPLY 6’6” ACCESS
EQUIPMENT & FINISHES
· 100 WATT LIGHT, WHITE OR BLUE LENS
· 6” BAND OF CERAMIC WATERLINE TILE & BULL NOSE BRICK BORDER COPING
· JANDY CS200 CARTRIDGE FILTER WITH A 2 SPEED 2 HPJANDY PUMP TO MEET NEW 2010 BUIDING CODES
· DELUXE UPGRADE AGGREGATE POOL PLASTER FINISH
(CLI-SUNSTONE) WITH A REAL 10 YEAR WARRANTY
ELECTRIC INCLUDES:
· PLANS, PERMITS, LABOR, AND ALL MATERIALS INCLUDED. TIME CLOCKS AND LIGHT TRANSFORMERS, AND INSPECTIONS. HOOK UP TO EXISTING PANEL.
· PRE-FILTER SYSTEM TO PURIFY INITIAL START-UP WATER
(CARBON TANKS). SO YOU ARE READY TO SWIM.
· JOB SITE: CLEAN UP AFTER EACH PHASE OF CONSTRUCTION.
· COMPLETE INITIAL CHEMICALS START-UP SERVICE & OPERATING INSTRUCTIONS. (POOL SCHOOL )
· ALL NECESSARY CONSTRUCTION & FINAL INSPECTIONS REQUIRED BY MUNICIPALITY PUBLIC LIABILITY AND WORKMAN’S COMPENSATION INSURANCE
· POOL FLOATATION , CONSTRUCTION PROPERTY DAMAGE & NEGLIGENCE INSURANCE
· $1,000,000 TO $ 2,000.000 UMBRELLA INSURANCE POLICY
ANNIVERSARY CHECK UP
· COMPLETE QUALITY SYSTEM CHECK UP( POOL & EQUIPMENT )
ONE YEAR FROM COMPLETION DATE
WARRANTIES:
INCLUDES:
OVERSIZED POOL 27’X15’
SUNSHELF/ TANNING LEDGE $2,000. *** NC
2 Bubblers on sunshelf w/ Umbrella mounting device $700. ***NC
Swim Out Oversized Deep End $600. ***NC
Upgraded Jandy CS-200 Filter $900 ***NC
Over 800’Pavers Pkg includes $ 4000.00
Upgraded Jandy 2HP 2 Speed Pump $1200 ***NC
LED Programmable light show @ $1050.00 ***NC
2 Massage Therapy Jets on Swimout ***NC
Outline Steps And Benches with accent tile $500.00 ***NC
Small equipment access shuttle $600.00
YOUR PRICE WITH PAVER AND OTHER DISCOUNTS ****$25,400.00
I am new to the forum, but am loving all the advice and help I have found so far. My wife and I have debating about building a pool for quite some time now, and have finally opted to go for it. We have spoke with a few companies and have made our decision on one, I wanted to include our estimate for the pool to get your thoughts on if there is anything I am missing by chance, and if the quote seems decent. Thanks again for all your help, and looking forward to taking you all on this journey. Please see below quote:
Parkwood Pools Advantage Program
Scope of work
27’X15’ Lagoon
STRUCTURAL:
· STEEL REINFORCING THROUGHOUT STRUCTURE TO MEET
· ASTM NO.A615
· GRAVEL ROCKBASE FOUNDATION FOR DEEP END POOL SHELL
· GUNITE CONCRETE SHELL TO MEET OR EXCEED LOCAL BUILDING CODES
· MIMIMUM 8” GUNITE WALLS & FLOORS
· GUNITE STRUCTURAL PERIMETER BOND BEAM CONSTRUCTION
· PRE- BENT STEEL LOOP TIE IN’S 9” ON CENTER FOR BOND BEAM TO WALL STEEL
· GUNITE STEPS IN SHALLOW END OF POOL
· GUNITE EXTENDED BENCH IN DEEP END OF POOL (SWIMOUT)
· LIFE TIME STRUCTURAL WARRANTY
PLUMBING & HYDRAULICS:
· SCHEDULE 40 NON-CORROSIVE PVC PLUMBING
· BACKFILL OF CONCRETE SHELL AND PLUMBING LINES
· ANTI-VORTEX SINGLE CHANNEL DRAIN ( NEW SAFETY DRAINS)
· INDEPENDENT POOL CLEANER LINE WITH SPRING LOADED SAFETY CAP
· AUTOMATIC WIDE MOUTH SKIMMER ENCASED IN GUNITE BEAM
· MINIMUM 3RETURN LINES FOR CIRCULATION, 3 RETURNS IN WAL FOR HEATING AND CHEMICAL CIRCULATION
· HYDROSTATIC UPLIFT VALVE WITH UNDERDRAIN STUB OUT FOR FUTURE DRAINAGE
· HOOK –UP & PRESSURE TEST PLUMBING LINES FROM FILTER TO POOL 50’ PIPE RUN
· OVERFLOW LINE FOR CONVENIENT AUTO DRAIN
· SMALL MACHINE ACCESS CUSTOMER TO SUPPLY 6’6” ACCESS
EQUIPMENT & FINISHES
· 100 WATT LIGHT, WHITE OR BLUE LENS
· 6” BAND OF CERAMIC WATERLINE TILE & BULL NOSE BRICK BORDER COPING
· JANDY CS200 CARTRIDGE FILTER WITH A 2 SPEED 2 HPJANDY PUMP TO MEET NEW 2010 BUIDING CODES
· DELUXE UPGRADE AGGREGATE POOL PLASTER FINISH
(CLI-SUNSTONE) WITH A REAL 10 YEAR WARRANTY
ELECTRIC INCLUDES:
· PLANS, PERMITS, LABOR, AND ALL MATERIALS INCLUDED. TIME CLOCKS AND LIGHT TRANSFORMERS, AND INSPECTIONS. HOOK UP TO EXISTING PANEL.
· PRE-FILTER SYSTEM TO PURIFY INITIAL START-UP WATER
(CARBON TANKS). SO YOU ARE READY TO SWIM.
· JOB SITE: CLEAN UP AFTER EACH PHASE OF CONSTRUCTION.
· COMPLETE INITIAL CHEMICALS START-UP SERVICE & OPERATING INSTRUCTIONS. (POOL SCHOOL )
· ALL NECESSARY CONSTRUCTION & FINAL INSPECTIONS REQUIRED BY MUNICIPALITY PUBLIC LIABILITY AND WORKMAN’S COMPENSATION INSURANCE
· POOL FLOATATION , CONSTRUCTION PROPERTY DAMAGE & NEGLIGENCE INSURANCE
· $1,000,000 TO $ 2,000.000 UMBRELLA INSURANCE POLICY
ANNIVERSARY CHECK UP
· COMPLETE QUALITY SYSTEM CHECK UP( POOL & EQUIPMENT )
ONE YEAR FROM COMPLETION DATE
WARRANTIES:
- Lifetime Transferrable Structural Warranty (Parkwood Pools)
- Lifetime Filter Warranty (Jandy)
- Lifetime Valve Warranty (Jandy) Against Leaking, Breaking, & Pressure Loss or Slip
- 5 Year Heat Pump or Gas Heater Warranty (Jandy) (If Purchased)
- 10 Year CLI (Sunstone) Warranty
- Lifetime Pump Housing & 3 Year Motor Warranty (Jandy)
INCLUDES:
OVERSIZED POOL 27’X15’
SUNSHELF/ TANNING LEDGE $2,000. *** NC
2 Bubblers on sunshelf w/ Umbrella mounting device $700. ***NC
Swim Out Oversized Deep End $600. ***NC
Upgraded Jandy CS-200 Filter $900 ***NC
Over 800’Pavers Pkg includes $ 4000.00
Upgraded Jandy 2HP 2 Speed Pump $1200 ***NC
LED Programmable light show @ $1050.00 ***NC
2 Massage Therapy Jets on Swimout ***NC
Outline Steps And Benches with accent tile $500.00 ***NC
Small equipment access shuttle $600.00
YOUR PRICE WITH PAVER AND OTHER DISCOUNTS ****$25,400.00