- May 19, 2016
- 129
- Pool Size
- 95000
- Surface
- Vinyl
- Chlorine
- Liquid Chlorine
I have 2 wrinkles in my vinyl liner on opposite sides of my shallow end walls. Could not flatten it out so called the installer to take a look. Long story short, I have to drain my pool until the shallow end is empty so the liner can be pulled down into the corners. Which should only take a half an hour to fix, and then I can start to refill.
so I have to drain about 60000 litres, or 16,000 gallons of perfectly clear, perfectly balanced, 85 degree water down the sewer so I can turn around half an hour later and fill it with freezing cold, untreated municipal water.
Questions is, has anyone any links to threads or videos that show how to build temporary water storage that won't cost me an arm and a leg? Seems such a waste of water and energy for such a short period. Suggestions?
Thanks
S
so I have to drain about 60000 litres, or 16,000 gallons of perfectly clear, perfectly balanced, 85 degree water down the sewer so I can turn around half an hour later and fill it with freezing cold, untreated municipal water.
Questions is, has anyone any links to threads or videos that show how to build temporary water storage that won't cost me an arm and a leg? Seems such a waste of water and energy for such a short period. Suggestions?
Thanks
S