Question on Timeline - Water or Deck first

GoBlue

Member
Jun 10, 2007
9
We are renovating our pool and have a bit of a debate going on between the pool guy and the concrete guy. The pool has polymer sides and a vinyl liner. The pool guy wants the concrete deck poured so that concrete doesn't end up in the pool. He doesn't think the concrete guys are not neat enough. Concrete guy says liner and water goes in first because the added weight of the concrete may buckle the polymer sides.

I tend to agree with the concrete guy. We had a pool installed when I was a kid and the concrete deck was last.

Your thoughts? :?:
 

JohnT

Admin
Mod Squad
TFP Expert
Apr 4, 2007
9,624
SW Indiana
Deck last. Concrete is going in the pool no matter how you do it. With the water in there, it won't stick to anything below the water level.
 

habajaba

LifeTime Supporter
Jun 11, 2007
27
Bradenton, FL
Mine was done deck last. And it's been poured two whole times (long story). Both concrete guys made a mess and it was a pain to clean out. But, as said before, anything under the water line should come out easily. Make sure if you have aluminum coping (or the like) that you/they coat it with Dawn soap before the pour. That makes it alot easier to get the concrete off later. They forgot to do it on my plastic steps and it's nearly impossible to get off now! I can speak from experience, that the cheap no name concrete guys and the high end reputable concrete guys make a very similar mess!
 

MarkC

Well-known member
May 14, 2007
57
Can you lay plastic in the pool to catch some of the stuff that the concrete guys get into the pool?
 

Craig

LifeTime Supporter
May 24, 2007
116
Staten Island NY
Mine was done pool, liner & water 1st. The concrete guys will make a mess. As good as they maybe, they are only human and will spill. As mentioned above, anything spilled in the pool can be cleaned quite easily.