Well, back in February, we contracted with a pool company to build our pool and our kitchen structure. I decided to not have them do the "kitchen" because they quoted a really high price and we didn't know what we wanted yet.
Before they poured the concrete I did the stub-ins and told them what I wanted for power (which they messed up and gas).
Here is the structure going up back in May:
Hmmmmm.... well, the total pics you can have is limited to 250k and I have 243k used, so I guess this is useless since it would revolve around pictures. Oh well.....
Before they poured the concrete I did the stub-ins and told them what I wanted for power (which they messed up and gas).
Here is the structure going up back in May:
Hmmmmm.... well, the total pics you can have is limited to 250k and I have 243k used, so I guess this is useless since it would revolve around pictures. Oh well.....