I’m replacing and removing some items from our pad. Removing booster pump and chlorinator. Replacing pump with VS circupool and replacing SWG with RJ 45+. Also replacing valves and unions.
Should I convert all above ground pipes to 2in ? Currently 1.5in
Should I plumb the pump and SWG back basically the same way or does anyone have better routing ideas since I will have a fresh start?
Also need advice on where and what model valves and unions should be
Should I convert all above ground pipes to 2in ? Currently 1.5in
Should I plumb the pump and SWG back basically the same way or does anyone have better routing ideas since I will have a fresh start?
Also need advice on where and what model valves and unions should be