Found the site a bit late, but I guess I am still in the "under construction" phase as the pool just started filling today and they come out to form the deck and patio for the concrete pour in a couple of days.
We broke ground July 13th and it has been a bit of a ride. The pool was formed a couple of days later on the 15th and sat for over a month. During the month the rain filled in part of it for us, then they came back out and re-formed the parts that collapsed.
Rebar and plumbing was done on August 19-20 and they came out to shoot the pool on the 26th. They got started and after numerous issues with clogging hoses and the mix being wrong, they left after shooting about a third of the pool. They came back on the 31st and finished the job.
The PB brought the equipment out on September 17th, which is the topic of another thread over in the Pumps, Filters, and Plumbing forum, and did the finish plumbing and got the lights installed. Long story short, contract said Pentair but we got First Choice pool equipment.
Yesterday, 20 September, they came out and prepped the pool for plaster and came out today and finished the plaster job in about 4 hours. The results, I think, are amazing and the crew did a great job. As they were finishing up the electricians showed up to run the power and connect the equipment.
The pool is a 15X30 Roman style 3.5 to 6.5 ft. deep. 1 skimmer and 2 drains with 4 returns. Nothing fancy, just a simple, functional pool to enjoy during these Texas summers.
We went with the marble dust plaster in turquoise with the meridian 6in tiles and 2in meridian accent tiles along the stairs and swim out. We have travertine coping and will have a 6ft concrete deck all the way around tying into a 15X26 patio from the house to the pool.
We broke ground July 13th and it has been a bit of a ride. The pool was formed a couple of days later on the 15th and sat for over a month. During the month the rain filled in part of it for us, then they came back out and re-formed the parts that collapsed.
Rebar and plumbing was done on August 19-20 and they came out to shoot the pool on the 26th. They got started and after numerous issues with clogging hoses and the mix being wrong, they left after shooting about a third of the pool. They came back on the 31st and finished the job.
The PB brought the equipment out on September 17th, which is the topic of another thread over in the Pumps, Filters, and Plumbing forum, and did the finish plumbing and got the lights installed. Long story short, contract said Pentair but we got First Choice pool equipment.
Yesterday, 20 September, they came out and prepped the pool for plaster and came out today and finished the plaster job in about 4 hours. The results, I think, are amazing and the crew did a great job. As they were finishing up the electricians showed up to run the power and connect the equipment.
The pool is a 15X30 Roman style 3.5 to 6.5 ft. deep. 1 skimmer and 2 drains with 4 returns. Nothing fancy, just a simple, functional pool to enjoy during these Texas summers.
We went with the marble dust plaster in turquoise with the meridian 6in tiles and 2in meridian accent tiles along the stairs and swim out. We have travertine coping and will have a 6ft concrete deck all the way around tying into a 15X26 patio from the house to the pool.