Hello evry1 my name is Jo. The wife and I decided this year to get a new inground pool ( freeform pool 31x14 10581 gallons/pool depth 3'6" to 6'6"/ 8' tan deck, 2bubblers, raised beams with 3' water sheer, Pentair intelliconnect, filter 320, intelliflow vs, chlorinator,2 intellibrite led, 36" round table, 400k heater) we had several bids. We signed a contract on 6/2/2020. 1 HOA approval denied, too much concrete decking, 1 city inspection failed due to excavation to close to the house, finally excavation was done in August 10, 2020 (backyard had a big hole for 2 months) ,we had 2 cave ins, gunite & short plumb in October 13,2020, plumbing & pool equipment November 4,2020, November 18,2020 tile & coping, concrete deck completed December 8, 2020, December 14, 2020 clean up, December 15,2020 plaster with quartz, pool filled with water complete 12/16/2020. Today is 12/22/2020 and we have not been able to enjoy the pool yet, we did get a heater. The weather currently here in La Porte, Tx has been cool. The plaster looks terrible we have several blotch spots of white like the quartz was not mixed correctly but the pool company claims that they will fix it. We are expecting to get the gas line installed today for the heater and soon a one on one with the start up technician of our pool equipment. Been frustrating not having our backyard for so long. We are getting a new fence and looking forward on some landscaping soon. We knew going into the pool build process it would take time but not this long. We are hoping for the best. Hope evry1 has a blessed day!
Portions edited to remove references to pool company. Forum Rule #4. TFP Mod.
Portions edited to remove references to pool company. Forum Rule #4. TFP Mod.
Attachments
Last edited: