I just completed the SLAM process due to a Mustard Algae outbreak. I met all 3 requirements of SLAM. I've been running my pool pump 24 hours per day for 4 days and brushing daily. Now awaiting drop in chlorine level. At the peak of the SLAM process, my chlorine level based on my CYA and using TFP chart and testing was 40.5.
I read several posts noting other test results ie. PH, etc. won't be accurate at high chlorine levels. So I'm looking for the resumption point at which I can again perform all other pool tests ie. PH, CYA, Borate, TA, etc.
Thanks....
I read several posts noting other test results ie. PH, etc. won't be accurate at high chlorine levels. So I'm looking for the resumption point at which I can again perform all other pool tests ie. PH, CYA, Borate, TA, etc.
Thanks....