I drained my pool over the weekend due to CH being 950 and CYA at 80. I scrubbed all the waterline tile clean with a pumice stone and it's just about finished refilling.
What do I do now? From reading the forum, looks like I should test the water, adjust PH first, then add liquid chlorine according to the CYA chart. Is this correct?
specs:
12.5k inground plaster pool with spa
pentair quad DE filter, 3 hp intelliflo pump, inline chlorinator
What do I do now? From reading the forum, looks like I should test the water, adjust PH first, then add liquid chlorine according to the CYA chart. Is this correct?
specs:
12.5k inground plaster pool with spa
pentair quad DE filter, 3 hp intelliflo pump, inline chlorinator