IntelliCenter programming Question

Bullpunch

Member
Sep 13, 2018
19
Orlando, FL
Good morning, I have been trying to add some programming but has not been able to do it. I would like to add some skim high time.
I need some help. Is it easier to do from the PC or my iPad?? Can anyone give me some steps to do it??
 

JJ_Tex

Bronze Supporter
Jul 17, 2019
968
Prosper, TX (DFW)
I used the PC, but the steps are:
1. Create a Skim High feature circuit (Settings, system configuration, circuits)
2. Add the Skim High circuit to your pump (same path as above, pumps)
3. Set the RPMs for each circuit, make your Pool circuit the lowest RPMs
4. Set the schedule (Settings, Schedules) for the pool circuit to run for the entire desired runtime of the pump (mine is 6:30am - 10:30pm)
5. Set the schedule for the new Skim High circuit. My skim high is scheduled from 7am - 8am and 5pm -10pm.
 
Last edited:

mknauss

Mod Squad
TFP Expert
Bronze Supporter
May 3, 2014
26,617
Laughlin, NV
Done!!
Thanks a lot!!!!
Time to keep learning
We are glad you have found our information helpful. Please, if you can, consider making a donation to TFP.
We are staffed by volunteers and are registered as an IRS 501 (c) (3) charity and donations are what keeps the forum operating without advertisements.

Support TFP!