I have a pool shed I need help designing the equipment setup. I haven’t done this before and am just wondering the most efficient possible setup options for ease of use, etc.
I have a dedicated 6x6 area with everything entering the pool shed on the bottom right
I have an idea, but not exactly sure how to run the plumbing either. I’m thinking 1.5 shut offs on the returns, then T them off into 1 single return after the shut offs.
if anybody is feeling crazy and wants to help out. thank you!!
I have a dedicated 6x6 area with everything entering the pool shed on the bottom right
I have an idea, but not exactly sure how to run the plumbing either. I’m thinking 1.5 shut offs on the returns, then T them off into 1 single return after the shut offs.
if anybody is feeling crazy and wants to help out. thank you!!