I am putting up my very first steel sided AGP and I have a question when it comes to leveling. We have begun digging and we have a pretty good start. The plan is to level the ground as close as possible, put a top coat of lime sand just thick enough to get everything smooth, and then throw on 1" XPS insulation board on top.
Right now, we have the ground cleared and we have a 2 foot ring around the outside of the whole that is within 1/2 inch across the entire circle (using a transit to level).
Our next step is to remove the rest of the ground in the middle of the pool to make it as level as possible.
1) We are aiming for 1/4" across the 24' for level on the outer ring. Is this a typical tolerance? should we be trying for 1/8 or should we be happy with 1/2?
2) On the center we will be happy with 3/4" difference as long as its smooth, but my guess is it will naturally turn out better than this because of the outer circle as a reference.
Right now, we have the ground cleared and we have a 2 foot ring around the outside of the whole that is within 1/2 inch across the entire circle (using a transit to level).
Our next step is to remove the rest of the ground in the middle of the pool to make it as level as possible.
1) We are aiming for 1/4" across the 24' for level on the outer ring. Is this a typical tolerance? should we be trying for 1/8 or should we be happy with 1/2?
2) On the center we will be happy with 3/4" difference as long as its smooth, but my guess is it will naturally turn out better than this because of the outer circle as a reference.