Weather permitting , everything showed up this week to bond ,went with the Permacast inline for 1 1/2" HP for water..all copper everything else.
So , I trench out around the pool , question is do I round-trip the whole system ?
Meaning start at the pump go up to the Aqua Trol -down to the Permacast inline -then out to the pool creating a halo /contacting frame -then return back to the pump.??? full circle??
Or do I halo around the pool and then run a separate lead to the SWG , Permacast , and terminate at pump?? off of the halo?
So , I trench out around the pool , question is do I round-trip the whole system ?
Meaning start at the pump go up to the Aqua Trol -down to the Permacast inline -then out to the pool creating a halo /contacting frame -then return back to the pump.??? full circle??
Or do I halo around the pool and then run a separate lead to the SWG , Permacast , and terminate at pump?? off of the halo?