AGP installed yesterday. Only about 1/2 to 2/3 full right now. I need to shut off water to head to work. No chemicals have been added yet. Pool builder suggested adding shock and algicide. Should I add anything this morning b4 heading to work? I have bleach but wondering if I should use the shock that came with the pool? I don't know what is in the algicide?