Pre replacing water activities?

Suley

0
LifeTime Supporter
May 31, 2011
246
Los Angeles, CA
Pool Size
23000
Surface
Plaster
Chlorine
Salt Water Generator
SWG Type
Pentair Intellichlor IC-60
I plan to replace my water about 70-75% due to high CH (CH=750) as soon as the watering restrictions are lifted in our area.

Are there any activities or maintenance operations I should perform before the water is changed? Some ideas I have are any maintenance activities which will dirty the water or anything which needs to be done with waterline below its usual level.

Thanks!
 
My main driver is water is salty to taste. Idk why but I guess since it is a low use pool most if the water in it last 3 years has been fill water for evaporation losses.

My fill water CH is 100.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.