CH - how low before adding calcium chloride?

Jul 18, 2012
20
Philadelphia, PA
TFP's recommend CH level for a plaster pool is 250 - 350 ppm. My current readings are:

FC - 3.5
CC - 0.0
pH - 7.5
Alk - 80
CH - 225
CYA - 30

Last year, CH was about 250 all season. This year I have been at 225. I test using Talor test kit (K-2006).

This is my 3rd season with pool. Pool was installed in May 2012. Water and plaster look good.

I haven't done anything at this point, but wanted to know if I should be worried and start to get the CH above 250.

Thanks
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.