SWG power requirements

Thanks for everyones input soo far. Timer ordered, should have tomorrow. PB was to order the power relay.

How will programing work tru the Autopilot? I perfer to use the timer to run the equipment for X hours a day and then use Autopilot to switch pump speed to high speed for cleaning. I don't have to synic the timer and the autopilot together, do I? If that the case I think I would be better off putting a switch to the pump to control the speeds. Are their pros and cons to either way?

In case anyone is interrested here is a link to the project.

http://www.troublefreepool.com/complete-ig-vinyl-pool-rebuilt-t70152.html

Again thanks for all the help.
Daren
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.