I had an extra 20 feet of AWG 6 solid coming out of the ground near my equipment pad. Someone cut off the wire and stole it. I understood that this wire was not to be spliced per code (NEC 680). Its 10 feet short of the pad; all the decking was poured a week ago.
What do I do now?
What do I do now?