New pool prospect here - I see in my bid that the PB is proposing $3100 for Pool Prep Work. This includes:
- 3 pallets of Sod
- Sprinkler system reroute
- Sprinkler repair - front & sides.
How much would it cost me to do all of this myself? Seems awefully high to me?
Thanks in Advance!
- 3 pallets of Sod
- Sprinkler system reroute
- Sprinkler repair - front & sides.
How much would it cost me to do all of this myself? Seems awefully high to me?
Thanks in Advance!