New Build in Central Texas

Vonrussell

0
LifeTime Supporter
Dec 1, 2011
19
Central Texas
Good Morning. We finally made the decision to put a pool in. We interviewed several pool builders and signed the contract at the end of February. The pool specs are as follows: Pool 20' X 36', 7' Round Spa, Pool depth 3' to 6', Paramount Pv-3 Infloor System, Oklahoma Flagstone Coping, Blue Glass tile at waterline, Pebble Brite Plaster, 2HP Tristar 2 Speed Pump, 1 1/2 HP Booster Pump, 3 Color Logic LED Lights (2 pool and 1 spa), Hayward 550 Cartridge Filter and Hayward 400k heater.

[attachment=2:eviyvey5]DSC05535.jpg[/attachment:eviyvey5]

[attachment=1:eviyvey5]DSC05572.jpg[/attachment:eviyvey5]

After several weeks of permit issues, we were ready to start excavation. Although we were ready, mother nature was not and dumped a ton of rain on us. We finally broke ground on March 15 but the excavators could only work for about 20 minutes because the ground was too wet. Lucky for us it did not rain that weekend and the excavators came back on the 19th and work for the whole day. Unfortunately, that night Mother Nature dumped about 2.5 inches of rain on us and completely filled the "pool".

[attachment=0:eviyvey5]DSC05585.jpg[/attachment:eviyvey5]
The "pool" had to be drained and the ground, which is mostly clay, had to dry out again. The excavators are scheduled to come out on Monday and hopefully finish the excavation portion of the build.

This excavation feels like it is taking forever. Silly me, I thought this would be the easy part. :lol:
 

Attachments

  • DSC05535.jpg
    DSC05535.jpg
    48.4 KB · Views: 1,036
  • DSC05572.jpg
    DSC05572.jpg
    50.3 KB · Views: 1,038
  • DSC05585.jpg
    DSC05585.jpg
    53 KB · Views: 1,036
Well we have finally gotten a break with the weather (and our excavator) and have made some good progress. We have the excavation completed,the infloor floor cleaner, steel and plumbing. Now we are just waiting on gunite on Tuesday.

[attachment=2:2dzfnb3m]DSC05603.jpg[/attachment:2dzfnb3m]

[attachment=1:2dzfnb3m]DSC05626.jpg[/attachment:2dzfnb3m]

[attachment=0:2dzfnb3m]DSC05632.jpg[/attachment:2dzfnb3m]
 

Attachments

  • DSC05603.jpg
    DSC05603.jpg
    57.7 KB · Views: 970
  • DSC05626.jpg
    DSC05626.jpg
    62.7 KB · Views: 971
  • DSC05632.jpg
    DSC05632.jpg
    67.2 KB · Views: 970
Steel and finish plumbing

[attachment=2:1j2drer3]DSC05650.jpg[/attachment:1j2drer3]

[attachment=1:1j2drer3]DSC05654.jpg[/attachment:1j2drer3]

[attachment=0:1j2drer3]DSC05664.jpg[/attachment:1j2drer3]
 

Attachments

  • DSC05650.jpg
    DSC05650.jpg
    56.4 KB · Views: 969
  • DSC05654.jpg
    DSC05654.jpg
    66 KB · Views: 966
  • DSC05664.jpg
    DSC05664.jpg
    67.1 KB · Views: 969
Pipes, pipes and more pipes

[attachment=2:1v0dgkxj]DSC05665.jpg[/attachment:1v0dgkxj]

[attachment=1:1v0dgkxj]DSC05668.jpg[/attachment:1v0dgkxj]

[attachment=0:1v0dgkxj]DSC05669.jpg[/attachment:1v0dgkxj]
 

Attachments

  • DSC05665.jpg
    DSC05665.jpg
    54.3 KB · Views: 968
  • DSC05668.jpg
    DSC05668.jpg
    53.8 KB · Views: 967
  • DSC05669.jpg
    DSC05669.jpg
    60.1 KB · Views: 967
The pool as of Good Friday

db60c039.jpg
 

Attachments

  • DSC05674.jpg
    DSC05674.jpg
    50 KB · Views: 967
The end is near... or at least that is what I keep telling myself :lol: We have the gunite in and the form removed. There will not be a lot of action this week except watering the pool. Next week will be tile and coping (hopefully). Here are a copy of pictures of the pool with gunite. Enjoy

41de4849.jpg


a1ece729.jpg
 

Enjoying this content?

Support TFP with a donation.

Give Support
Looks great, where in central texas are you located? Austin? We had similar delays due to the rain in march. We finally told them to at least make the pool swimmable. We were in a gunite state for almost a month. From the time I pressured them to get the actual pool done (vs decking/patio cover) to swimming was only like 5 days.

From where you are at it is basically

1) plumbing - 1 day
2) equipment set - half day
3) plaster - half day
4) fill 24 hours

A lot of it was just calling my guys every day and asking for dates. They missed most by a day or two, but they really stepped it up when I called every single day. We have been enjoying swimming in our construction zone, but filled up pool :)

Now Im putting pressure on them to finish the paver decking and patio cover.
 